检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]湖南益阳工程公司,湖南益阳413000 [2]华南理工大学土木与交通学院,广东广州510640
出 处:《铁道建筑》2014年第11期78-80,110,共4页Railway Engineering
基 金:国家自然科学基金资助项目(51108190)
摘 要:应用数值分析法研究了广州地铁一区间隧道盾构施工过程中渗流对地表沉降的影响。基于Peck横向地表沉降计算理论,将渗流产生的孔隙水压按隧道上覆土的重力归一化处理,且以理论计算所得沉降为标准,对考虑渗流作用的地表沉降进行归一化,提出了耦合渗流作用时最大地表沉降估算方法。与实测及理论计算结果对比分析表明,本文所建立的计算模型和地表沉降修正计算方法合理、有效。T his paper studied the effect of seepage on ground surface settlement by numerical analysis method during the shield tunnel construction in Guangzhou metro certain interval,normalized the pore pressure produced by seepage according to the tunnel overburden soil gravity based on Peck transverse ground surface settlement calculation theory,concluded the normalization of ground surface settlement under seepage effect by the settlement standard with theoretical calculation,and presented maximum ground surface settlement estimation method coupling the seepage effect. T he numerical model and modified calculation method of ground surface settlement proposed in this paper are reasonable and effective,which could be proved by the comparative analysis of measured and theoretical calculation results.
关 键 词:盾构隧道 地表沉降 修正计算方法 渗流作用 Peck理论 归一化
分 类 号:U455.43[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38