土压盾构渣土滞塞风险控制分析  被引量:7

CONTROL AND ANALYSIS ON MUCK BLOCKING RISK IN EARTH PRESSURE SHIELD PROJECT

在线阅读下载全文

作  者:黄威然[1,2] 刘人怀[1] 竺维彬[3] 钟长平 

机构地区:[1]暨南大学理工学院,广州510632 [2]广州轨道交通建设监理有限公司,广州510010 [3]广州市地下铁道总公司,广州510335

出  处:《建筑技术》2015年第1期70-73,共4页Architecture Technology

摘  要:土压盾构掘进下来的渣土,因地层特性(颗粒比重、大小和形状)、盾构机机械性能及施工控制三大原因而不能及时排出,易造成工程项目风险和工程机械故障。通过对滞塞的成因、风险、分类和解决方法进行分析,可对土压盾构渣土滞塞问题从盾构设计、制造和施工三方面提供相应对策。Muck can not be discharged out of excavated chamber of EPB(earth pressure balance) shield immediately due to the following three main reasons: geological characteristics (such as proportion, size and shape of granule), performance of shield machine and construction operation, etc., and this may cause engineering risk and mechanical failure. By analyzed reason, risk and classification, it can provide related countermeasures against muck blocking in EPB shield project , such as mechanical design, manufacture and construction.

关 键 词:盾构 隧道 滞塞 

分 类 号:TU921[建筑科学—建筑设计及理论]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象