检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《电测与仪表》2015年第9期6-10,40,共6页Electrical Measurement & Instrumentation
摘 要:电力系统负荷预测模型可以分为单一指标模型和信息集(多指标)模型,为客观准确地对中长期负荷预测进行研究,就要避免重要信息的遗漏,尽可能多的考虑与其有关联的信息。针对信息集模型中的大量信息,通过主成分分析法把综合信息集简化为少数几个主成分,降低了数据的维数;引入核函数和对偶技巧对支持向量机算法进行改进,有效避免了维数灾难和目标函数不可微的问题。通过标准SVM和PCA-SVM模型仿真对比,验证PCA-SVM模型预测结果更为准确,所提方法具有一定的实用性和有效性。Power system load forecasting model can be divided into the single index model and information collection model.To insure the accuracy, it is necessary to avoid missing the important information and must collect the related indicators as much as possible .This paper used principal component analysis ( PCA ) to simplify information .Data correlation removed and data dimension reduced through normalization processing .By introducing the kernel function and the dual skills of the support vector machine algorithm can effectively avoid the curse of dimensionality .Compared to the SVM method , the accuracy of load forecasting is effectively improved .
关 键 词:中长期负荷预测 综合信息集 主成分分析 支持向量机
分 类 号:TM732[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28