斜拉桥最大双悬臂阶段主梁剪力滞效应分析  

Shear Lag Effects of Main Girder in Cable-stayed Bridge of Longest Double-cantilever's Construction State

在线阅读下载全文

作  者:王伟[1] 杭淼[1] 

机构地区:[1]同济大学,上海200092

出  处:《佳木斯大学学报(自然科学版)》2015年第3期366-369,共4页Journal of Jiamusi University:Natural Science Edition

摘  要:以江西某π型截面预应力混凝土斜拉桥为背景,采用有限元方法分析最大双悬臂阶段主梁在自重、索力、预应力及组合作用下的剪力滞效应,研究主梁剪力滞系数分布规律,并通过改变自重、索力、预应力作用效应的组合系数,降低主梁部分截面剪力滞系数.With a pre-stressed concrete girder cable-stayed bridge with П-shaped cross-section in Jiangxi as an example, this paper studied the shear lag effect of girder at longest double-cantilever's construction state under self weight, stay cable forces, prestressing force and combination effect using finite element method, and researched the distribution rule of shear lag coefficient.The shear lag coefficient in the part of the cross sec-tion was reduced by changing the combination coefficient of the self weight, stay cable forces and prestressing force effect.

关 键 词:斜拉桥 剪力滞效应 有限元 Π型梁 最大双悬臂 

分 类 号:U441.5[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象