检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中铁二院工程集团有限责任公司,成都工程师610031 [2]西南交通大学峨眉校区交通运输系,峨眉614202
出 处:《城市轨道交通研究》2016年第5期86-90,共5页Urban Mass Transit
摘 要:当地铁的车辆段、停车场位于线路中部时,高峰期的加车将受到正线行车间隔的影响。本文对向正线增加运行列车的原理、过程进行详细分析,并通过计算得出能够保证向正线增加运行列车情况下的正线行车间隔,而且此行车间隔不影响后续列车正常运行。并给出了高行车密度下为了向正线增加运行列车可以采取的行车计划调整措施。When a depot is located in the middle of urban rail transit line, the insertion of train operation in rush hours is resticted by the headway of the mainline train service. In this paper, the train insertion principle and process are analyzed in details, the calculation result shows that the minimum headway where the train could be inserted will not cause any delay on the mainline. Therefore, a train regulation scheme is proposed in order to insert train from depot when the headway of the mainlinetrain services is shorter than the required minimum headway.
分 类 号:U279[机械工程—车辆工程] U292[交通运输工程—载运工具运用工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28