检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]北京交通大学交通运输学院,北京100044 [2]铁道第三勘察设计院集团有限公司线路站场枢纽设计处,天津300142
出 处:《铁道货运》2016年第11期24-27,共4页Railway Freight Transport
基 金:中央高校基本科研业务费专项资金资助(2012JBM071)
摘 要:根据27 t轴重通用货车所具有的车轮直径增大、总重增加和车体尺寸增大等特性,分析由此带来的对驼峰设计与作业控制的单位基本阻力减小、制动能力下降、驼峰控制范围增加、单位风阻力增大等影响。从调速控制、平纵断面及峰高设计3个角度提出具体的应对措施,为应用27 t轴重通用货车时的驼峰设计及作业控制提供理论参考。27t Axle-load General Service Freight Car(27t AGSFC) has lager wheel diameter, heavier axle-load, and bigger body size, which lead to some hump design and operating control issues, like decreasing unit basic resistance, reducing braking force, enlarging hump control range, increasing unit wind resistance. Therefore, several countermeasures have been proposed to provide the theoretical references for the hump design and operation control of the 27 t AGSFC in the view of speed control, hump height design, horizontal and vertical design.
关 键 词:单位基本阻力 平纵断面设计 峰高设计 调速控制 货车轴重
分 类 号:U291.43[交通运输工程—交通运输规划与管理]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.58.133.140