检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中铁二院工程集团有限责任公司,成都610031
出 处:《地质灾害与环境保护》2017年第1期106-110,共5页Journal of Geological Hazards and Environment Preservation
摘 要:以在建成兰铁路松潘隧道为工程实例,探讨研究地下水和构造应力共同作用下炭质板岩隧道变形特征。通过变形原因分析,采取设置长锚杆、注浆加固松散围岩、加强钢拱架锁脚等措施,能够有效控制变形。将软岩变形控制措施纳入动态设计是一种较为经济合理的手段。通过工程试验,动态调整工程措施,优化变形控制方案,对成兰铁路隧道建设具有较好的指导意义和工程借鉴。The discussion of carbonaceous slate tunnel deformation control technology under the groundwater conditionlt takes under construction Song-pan tunnel engineering of Chengdu-Lanzhou railway as an example in this paper, for studying the de- formation characteristics of carbonaceous slate tunnel under the groundwater and the tectonic stress combining action. To set up long bolt and grout loose surrounding rock for reinforcing and strengthen lock foot of the steel arch frame, through analyzing the reason of the deformation, those methods can control the deformation effectively. It is a more economic and reasonable method that taking soft rock deformation control measures into the dynamic design. Dynamic adjustment of engineering measures and optimization the scheme of deformation control which provide a good guiding significance and engineering reference for Chengdu-Lanzhou railway tunnel construction, through the engineering test.
分 类 号:P642[天文地球—工程地质学] U25[天文地球—地质矿产勘探]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28