既有运营地铁车站底板下分段分步暗挖法施工技术  被引量:1

The key technology for construction by section and by stage using subsurface excavation method under existing subway station floor

在线阅读下载全文

作  者:吴沛岭 朱招庚[1] 

机构地区:[1]中国中铁二院工程集团有限责任公司地铁院,四川成都610031

出  处:《山西建筑》2017年第4期116-117,共2页Shanxi Architecture

摘  要:以某市地铁换乘车站为研究对象,论述了该换乘节点分段分步暗挖法施工的开挖工序及支护措施,并运用MIDAS/Gen建立三维数值模型,获得不同开挖工况下结构的内力与位移,结果表明采用该工法施工,结构的内力及位移均满足规范要求。Taking a subway transfer station as the research object, the paper detailed the excavation procedure and supporting measures for the construction of interchange joint by section and by stage using subsurface excavation method. At the same time, using MIDAS/Gen establish three-dimensional numerical model in order to obtain the internal force and displacement of the structure under different excavation conditions. The results show that the internal force and displacement of the structure meet the specification requirements.

关 键 词:地铁车站 换乘节点 分段分步 暗挖法 

分 类 号:U231.4[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象