检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中铁二院工程集团有限责任公司,成都610031 [2]中铁磁浮交通投资建设有限公司,武汉430060
出 处:《高速铁路技术》2017年第5期57-59,共3页High Speed Railway Technology
摘 要:成昆铁路增建二线在既有西来埝铁路中桥处,受上方眉山市西来埝公路桥孔跨限制,既有线与增建二线线间距控制,以及铁路桥下道路和灌溉渠正常使用等影响,工程方案较难确定。本文对增建二线方案进行了研究,通过技术比选最终确定采用桥改路基方案,即既有线与增建二线一并采用路基的通行方式替代采用桥梁的通行方式,该方案具有充分的可行性和足够的安全性,可供类似工程参考借鉴。It is difficult to determine the pass scheme of the second new railway of the existing Chengdu-Kunming railway at Xilainian bridge. Because the span of the Xilainian highway bridge in Meishan is limited,the distance between the existing line and second line is controlled and the road and irrigation channel under the railway bridge must be used normally. Based on the research on the second new line,the scheme of changing the existing bridge to subgrade is finally selected through comparison and selection of technologies. The existing railway and second railway will be operated together by roadbed instead of bridge. The scheme has sufficient feasibility and security. The research results of this paper can provide reference for similar projects in the future.
分 类 号:U445.6[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15