地铁四线并行下穿火车站股道及站房关键技术研究  被引量:7

Key Technology Research on Four Parallel Lines of Metro Underpassing Railway Track and Station House

在线阅读下载全文

作  者:丁玉龙[1] 

机构地区:[1]中铁十六局集团有限公司,北京100018

出  处:《铁道建筑技术》2018年第1期82-86,共5页Railway Construction Technology

基  金:中国铁建股份有限公司科技研发计划项目(14-C18)

摘  要:盾构法是目前城市轨道交通建设中的主要方法之一,在施工中常会穿越既有火车站股道及站房,影响铁路运营安全与地铁施工安全。当前地铁穿越施工多为双线或三线下穿,四线并行穿越在国内十分少见,相关研究尚显不足,此外四线并行穿越会增大工程风险与隐患,因此开展相关研究意义重大。探讨盾构隧道四线并行下穿火车站股道及站房的关键技术,研究成果可为同类工程参考。At present, the shield method is one of the main mays of city rail transit construction in China. Crossing the existing railway track and station is often occurred in the construction, which will influence the safeties of railway operation and subway construction. Double-line or three lines down-traversing are frequent in current subway construction, while four parallel lines down-traversing is very rare in China, the related research is insufficient, and the four parallel lines down- traversing will increase the engineering risks, so it is of great significance to carry out the related research. This paper made a discussion on the key technologies on four parallel lines of shield tunnel underpassing railway track and station house. It could be served as a reference for similar projects.

关 键 词:地铁工程 盾构隧道 四线并行下穿 火车站股道及站房 

分 类 号:U455.4[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象