检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:程继余 薛惠芳[1] CHENG Jiyu;XUE Huifang(College of Mechanical and Power Engineering,Nanjing University of Technology,Nanjing 210000,China)
机构地区:[1]南京工业大学机械与动力工程学院,江苏南京210000
出 处:《机械制造与自动化》2018年第1期50-51,65,共3页Machine Building & Automation
摘 要:对双馈式风力发电机齿轮箱研究的必要性进行简单说明;探讨了齿轮箱各轴等效到主轴(风轮轴)上的刚度换算和转动惯量计算方法;推导了整个传动系统的主谐振频率;对1.5MW齿轮箱进行了主谐振频率计算,并与叶片穿越频率及齿轮啮合频率进行比较分析,得出结论为系统的主谐振频率主要表现为与叶片穿越频率振动区重叠。By comparing doubly-fed wind generator with direct drive wind turbine,a further study of the gear box for doubly-fed wind power generator is necessary.This paper discusses the stiffness conversion and inertial moment calculation on the shafts of the gear box,including gear shaft and motor shaft,deduces the main resonance frequency of the whole drive system,calculates the main resonance frequency of 1.5 MW gear box,and compares the through frequency of the blade with the gear meshing frequency.It draws the conclusion that the primary resonance frequency field of this system overlaps the through frequency field of the blade.
分 类 号:TK83[动力工程及工程热物理—流体机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28