检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈舒阳 曹禄来 姚永胜 CHEN Shuyang;CAO Lulai;YAO Yongsheng(School of Civil Engineering,Central South University of Forestry and Technology,Changsha 410004,China;National Engineering Laboratory of High-speed Railway Construction Technology,Changsha 410075,China;China Construction Fifth Engineering Division Corp.,Ltd,Changsha 410004,China;Department of Civil and Environmental Engineering,Hongkong University of Science and Technology,Hongkong 999077,China)
机构地区:[1]中南林业科技大学土木工程学院,湖南长沙410004 [2]高速铁路建造技术国家工程实验室,湖南长沙410075 [3]中国建筑第五工程局有限公司,湖南长沙410004 [4]香港科技大学土木与环境工程系,中国香港999077
出 处:《铁道科学与工程学报》2020年第7期1645-1654,共10页Journal of Railway Science and Engineering
基 金:国家自然科学基金资助项目(41272376,51908562);高速铁路基础研究联合基金资助项目(U1134207);铁道部专项资助项目(2011G017-C)。
摘 要:传统铁路路基状态评估的有损检测不宜用于高铁无砟轨道,而以轨检车为代表的无损检测物理意义不明确,难以定性路基病害或预测其变化趋势。鉴于高铁路基易受工后沉降及运营环境等多因素影响,类似于工程承灾模型,故以灾变论为基础,引入工程易损性理念。分别将运营环境与路基自身属性类比为致灾体、承灾体,将常规轨检车动检与工后沉降监测、外部运营环境调查相结合,采用可拓物元分析法为计算模型,提出高铁路基服役状态评价新方法,并依托沪宁城际铁路典型区段展开实例分析。研究结果表明:引入工程易损性理念后,实现了基于统计学意义、工学机理与工程地质环境的高铁路基状态“三位一体”综合评判,有助于反映其瞬时性状、病害成因及发展趋势,较传统方法更为全面合理。该方法可为高铁路基服役状态的提前预判与及时响应,以及铁路部门运营方案调整及养护维修等提供理论支撑。The previous destructive detection method for railway subgrade status assessment can’t be applied in the current ballast-less track high speed railway.Yet,the nondestructive detection method such as track inspection car is also disadvantaged in randomness and inexplicit physical significance,which hindered the determining of subgrade defects and its changing tendency prediction.In consideration of subgrade suffering from post-construction settlement and various factors in operation environment,the concept of engineering vulnerability was introduced into this study.In order to analyze the outer operation environment and subgrade inner feature,the analogical objects in terms of hazard-caused body and hazard-affected body were adopted respectively,and the routine track inspection car,post construction settlement detection and outer operation environment survey were integrated organically.By taking the extension theory as calculation model,a new method of assessing high-speed railway subgrade service status was proposed.The research was conducted on several trial subgrade sections of Shanghai-Nanjing intercity high-speed railway.The main conclusions are as follows.Through introduction of engineering vulnerability concept,the comprehensive trinity assessments based on statistics,engineering mechanism and geological environment were accomplished.This method would assist to indicate the instantaneous status,defects mechanism and development tendency of high-speed railway subgrade,which can be completer and more legitimate than the previous methods.Moreover,this study can provide theoretical foundation for anticipated prediction and timely response for high-speed railway subgrade service status,as well as the adjustment of operation schemes and maintenance measures.
关 键 词:高铁路基 服役状态 工程易损性 工后沉降 轨道质量指数
分 类 号:U238[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200