盾构隧道下穿宁启铁路(南通站)工程技术方案分析  被引量:3

Analysis on Technical Scheme of Shield Tunnel underneath Nanjing-Qidong Railway(Nantong Railway Station)

在线阅读下载全文

作  者:赵星[1] ZHAO Xing(China Railway Siyuan Survey and Design Group Co.,Ltd.Wuhan 430063)

机构地区:[1]中铁第四勘察设计院集团有限公司,武汉430063

出  处:《现代隧道技术》2020年第S01期581-587,共7页Modern Tunnelling Technology

摘  要:结合南通城市轨道交通2号线盾构隧道下穿宁启铁路(南通站)实际工程,介绍了盾构隧道穿越宁启铁路股道、站台、雨棚柱、旅客出站地道以及铁路用房的设计方案,同时建立三维模型对盾构隧道穿越施工进行数值模拟,根据计算结果提出了一些穿越宁启铁路(南通站)的保护措施以及相关要求,确保盾构下穿施工时南通站的安全,为类似工程施工积提供工程经验。Based on Nantong metro line 2 shield tunnel project,this paper introduces the design of shield tunnel underneath railway track,station,canopy,passenger export and railway building.At the same time,the finite numerical model of shield tunnel crossing railway track is established.According to the calculation results,some protection measures and relevant requirements for crossing Ningqi railway(Nantong station)are put forward to ensure the safety of Nantong station during shield tunnelling,providing experience for similar projects.

关 键 词:盾构隧道 南通站 宁启铁路 股道 雨棚柱 

分 类 号:U455.43[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象