检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:高国飞[1] 张星臣[1] 罗强 沈景炎 GAO Guofei;ZHANG Xingcheng;LUO Qiang;SHENG Jingyan(School of Traffic and Transportation,Beijing Jiaotong University,Beijing 100044,China;National Engineering Laboratory for Green&Safe Construction Technology in Urban Rail Transit,Beijing Urban Construction Design&Development Group Co.,Ltd.,Beijing 100037,China)
机构地区:[1]北京交通大学交通运输学院,北京100044 [2]北京城建设计发展集团股份有限公司城市轨道交通绿色与安全建造国家工程实验室,北京100037
出 处:《中国铁道科学》2021年第1期156-165,共10页China Railway Science
基 金:国家重点研发计划项目(2017YFBl201104);国家自然科学基金资助项目(U1734204);北京市青年骨干项目(2018754154700G312)。
摘 要:为顺应当前市域快速轨道交通快慢车混合运行的运输组织发展趋势,提出1种可适应不同列车开行方案与开行比例的线路通过能力计算方法。考虑列车最小追踪间隔时间、快慢车开行比例、区间快车越行节约时间、列车在各站的停站时间等重要因素,分越行(设越行站)、追踪(不设越行站)2种运输组织模式,推导所有可能情况下的线路通过能力计算式,构建通用的快慢车混合运行时线路通过能力计算方法;依托广州地铁14号线实际运营数据,计算特定条件下的线路通过能力。结果表明:快慢车开行数量相等时的线路通过能力最小,此时越行模式和追踪模式下的线路通过能力分别为20和13列·h-1;越行模式下,线路最大通过能力为28列·h-1,且随着快车开行数量的增加,通过能力逐渐降低;追踪模式下,以慢车为主和以快车为主的2种开行方案的线路最大通过能力分别为26和30列·h-1,且以快车为主的开行方案的线路通过能力大于以慢车为主的方案。In order to comply with the development trend of transportation organization in regional rapid rail transit with the mixed operation of express/local trains,a calculation method of line carrying capacity is proposed,which can adapt to different train operation schemes and operation proportions.Considering such important factors as the minimum tracking interval time,the proportion of express/local trains,the time saving for express trains overtaking in sections and the stopping time of trains at each station,the calculation formulas of line carrying capacity under all possible conditions are derived by dividing the two transportation organization modes of overtaking(with overtaking stations)and tracking(without overtaking stations).The general calculation method for the line carrying capacity under the mixed operation of express/local trains is constructed.Based on the actual operation data of Guangzhou Metro Line 14,the line carrying capacity under specific conditions is calculated.Results show that:the line carrying capacity is the minimum when the number of express and local trains is equal,and the line carrying capacity under overtaking mode and tracking mode is 20 and 13 trains per hour respectively.Under the overtaking mode,the maximum line carrying capacity is 28 trains per hour,and with the increase of the number of express trains,the capacity gradually decreases.Under the tracking mode,the maximum line carrying capacity of the two operation schemes with local trains and express trains as the main modes are 26 and 30 trains per hour respectively,and the line carrying capacity of the scheme with express trains as the main mode is greater than that with local trains as the main mode.
关 键 词:市域快速轨道交通 快慢车混合运行 线路通过能力 列车开行方案 旅客运输组织
分 类 号:U239.5[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.45.170