检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:甘目飞 刘科 GAN Mufei;LIU Ke(CREEC(Chengdu)Survey,Design and Research Co.,Ltd.,Chengdu 610031,China)
机构地区:[1]中铁二院成都勘察设计研究院有限责任公司,成都610031
出 处:《高速铁路技术》2021年第4期82-86,共5页High Speed Railway Technology
摘 要:郑万铁路罗家山隧道横洞洞口分布大范围的危岩落石,对洞口施工人员及设备安全构成巨大威胁,本文采用Rockfall落石分析软件对坡面落石滚落弹跳高度、运动速度和冲击能量进行模拟分析,结合边仰坡实际情况,提出“落石清除及场地搬迁+混凝土明洞+高强波纹板棚洞+张口式帘式主动防护网+被动防护网”的综合措施,以减轻危岩落石危害,设计方案可为类似工程提供借鉴。A lot of overhanging rocks and rockfalls are distributed at the adit portals of Luojiashan Tunnel of Zhengzhou-Wanzhou Railway,posing a great threat to the safety of construction personnel and equipment.This paper uses Rockfall analysis software to simulate and analyze the jumping height,moving speed and impact energy of falling rocks on slope,and puts forward"clearing falling rocks and site relocation+concrete open-cut tunnel+high-strength corrugated board shed tunnel+open-mouth curtain active protective net+passive protective net"to reduce dangerous rockfalls.This design can provide a reference for similar tunnels in the future.
分 类 号:U216.415[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38