检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:舒恒[1] 彭雨杨 宋明 刘尚各 阳军生[2] 张聪 SHU Heng;PENG Yu-yang;SONG Ming;LIU Shang-ge;YANG Jun-sheng;ZHANG Cong(Second Highway Consultant Co., Ltd., CCCC, Wuhan 430056, China;School of Civil Engineering, Central South University, Changsha 410075, China;School of Civil Engineering, Central South University of Forestry and Technology, Changsha 410004, China)
机构地区:[1]中交第二公路勘察设计研究院有限公司,武汉430056 [2]中南大学土木工程学院,长沙410075 [3]中南林业科技大学土木工程学院,长沙410004
出 处:《科学技术与工程》2021年第25期10948-10955,共8页Science Technology and Engineering
基 金:国家重点研发计划(2017YFC0806003,2017YFC0806004,2017YFC0806010,2018YFC0809602)。
摘 要:为研究超大直径盾构隧道穿越岩溶发育区地表注浆合理加固范围,以武汉市某在建工程为依托,设计了以围岩等级、溶洞尺寸及溶洞充填范围为影响因素的正交试验,采用了三维数值方法求解不同方位溶洞与超大直径盾构隧道的最小安全距离,并提出了以最小安全距离主要因素为分段计算准则的地表注浆加固范围确定方法。结果表明:当溶洞位于隧道上方、侧方及下方时,最小安全距离的主要影响因素分别为溶洞尺寸、围岩等级及溶洞尺寸;当溶洞位于隧道上方时,分为4个区段,加固范围在12~22.5 m,当溶洞位于隧道侧方时,分为4个区段,加固范围在8~15 m,当溶洞位于隧道下方时,分为5个区段,加固范围在8~15.5 m。研究成果可为类似工程注浆设计与施工提供参考。In order to study the reasonable reinforcement range of surface grouting for super large diameter shield tunnels passing through karst development area,based on an engineering under construction in Wuhan,an orthogonal test with surrounding rock grade,karst cave size and karst filling range as influencing factors was designed.A three-dimensional numerical method was used to figure out the minimum safety distance between karst caves in different directions and the super large diameter shield tunnel,and a method for determining the surface grouting reinforcement range was proposed,which takes the main affecting factor of the minimum safety distance as the segment calculation criterion.The results show that when the cave is located above,on the side and below the tunnel,the main factors affecting the minimum safety distance respectively are the karst cave size,surrounding rock grade and karst cave size.When the karst cave is located above the tunnel,the karst development area is divided into 4 sections,and the reinforcement range is between 12 m and 22.5 m.When the karst cave is located on the side of the tunnel,the karst development area is divided into 4 sections and the reinforcement range is between 8 m and 15 m.When the karst cave is located below the tunnel,the karst development area is divided into 5 sections and the reinforcement range is between 8 m and 15.5 m.The research achievements can provide references for grouting design and construction of similar projects.
关 键 词:超大直径盾构 岩溶隧道 注浆 合理加固范围 最小安全距离
分 类 号:U457.3[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117