检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:向活跃[1] 陈绪黎 许三平[2] 李永乐[1] XIANG Huoyue;CHEN Xuli;XU Sanping;LI Yongle(School of Civil Engineering,Southwest Jiaotong University,Chengdu 610031,China;China Railway Siyuan Survey and Design Group Co.,Ltd.,Wuhan 430063,China)
机构地区:[1]西南交通大学土木工程学院,四川成都610031 [2]中铁第四勘察设计院集团有限公司,湖北武汉430063
出 处:《西南交通大学学报》2023年第1期175-182,共8页Journal of Southwest Jiaotong University
基 金:国家自然科学基金(51978589,51778544);中铁第四勘察设计院集团有限公司科技研发项目(2020K009);中央高校基本科研业务费(2682021CG014)。
摘 要:为确定适合400 km/h高速铁路的荷载图式,参考《京沪高速铁路设计暂行规定》中确定0.8UIC荷载作为高速铁路列车荷载图式所使用的方法,以包络德国ICE列车、中国ZGS和中速列车的换算均布活载动效应为原则,提出将0.65UIC荷载作为400 km/h高速铁路列车荷载图式;然后,在时速400公里高速列车作用下,对24、32、40 m 3种跨度简支梁桥,基于车桥耦合振动分析方法得到车辆动力响应,在此基础上研究动力系数、竖向挠度、梁端竖向转角和轨面不平顺等现行规范指标在0.65UIC荷载条件下的适应性;最后,讨论采用0.65UIC荷载作为设计荷载时,离心力、牵引力和制动力限值对400 km/h高速铁路列车的适应性.结果表明:在现行规范基础上,将0.65UIC荷载作为400 km/h高速铁路列车荷载图式进行桥梁设计是可行的,采用该荷载图式计算的桥梁设计指标限值和设计荷载限值较运营车辆与桥梁间的响应具有一定安全储备.To formulate the train load diagram suitable for the high-speed railway with a speed of 400 km/h,based on the principle of uniformly distributed live load effect of German ICE train,Chinese ZGS and the medium-speed train,0.65UIC load is proposed as the train load diagram of 400 km/h high-speed railway,referring to the method of determining 0.8UIC load as the train load diagram of high-speed railway in the Provisional Regulations on the Design of Beijing-Shanghai High Speed Railway.Then,for 24 m,32 m and 40 m span simply supported beam bridges,get the dynamic responses of the train under the action of 400 km/h highspeed train by means of train-bridge coupling vibration analysis method,and the adaptability of dynamic coefficient,vertical deflection,vertical angle of beam end and rail surface irregularity under 0.65UIC load is studied.Finally,the adaptability of the limits of centrifugal force,traction force and braking force to the 400 km/h high-speed railway train is discussed when the 0.65UIC load is used as the design load.The results show that,on the basis of the current code,the 0.65UIC load as the train load diagram of the 400 km/h high-speed railway can be applied to bridge design,and the bridge design index limit and design load limit calculated by this load pattern have a certain safety reserve compared with the response between the operating train and bridges.
关 键 词:400km/h高速铁路 列车荷载图式 车桥耦合 简支梁桥 参数适应性分析
分 类 号:U24[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49