检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:汪奔 宋飞 Wang Ben;Song Fei(Engineering Research Center of Railway Industry of Construction Technology for LongSpan Bridge in Special and Complex Environment,China Railway Major Bridge Reconnaissance&Design Institute Co.,Ltd.,Wuhan,Hubei 430050,China;High-speed Railway Operation and Maintenance Technology Center,China Railway Shanghai Group Co.,Ltd.,Shanghai 200071,China)
机构地区:[1]中铁大桥勘测设计院集团有限公司特殊复杂环境下长大桥梁建造技术铁路行业工程研究中心,湖北武汉430000 [2]中国铁路上海局集团有限公司高铁运维技术中心,上海200071
出 处:《铁道技术标准(中英文)》2023年第3期1-4,共4页Railway Technical Standard(Chinese & English)
摘 要:轨道几何形位直接影响列车行车安全性,而桥梁结构刚度决定了轨道几何形位值的大小。为得到评判桥梁结构刚度的两个轨道几何形位参数(轨向和高低),基于中点弦测法的计算原理,对其数值算法进行了研究。提出了几何法和插值法两种算法,对比了二者的计算精度和效率:几何法的控制弦长为指定弦长,计算精度比插值法高,能准确输出中点弦测值,但需联立求解高阶方程组,计算效率比插值法低。插值法采用的弦长为近似值,计算精度较几何法低,但计算效率高。两种方法均满足计算精度要求,并可以实现计算结果的可视化输出。The track geometry directly affects the safety of train operation,and the bridge structure stiffness determines the value of the track geometry.In order to obtain the two track geometric parameters(track direction and height)for evaluating the bridge structure stiffness,the numerical algorithm is studied based on the calculation principle of the midpoint chord measuring method.Two algorithms,geometric method and interpolation method,are proposed,and their calculation accuracy and efficiency are compared:the control chord length of geometric method is the specified chord length,and the calculation accuracy is higher than that of interpolation method.It can accurately output the midpoint chord measurement value,but it needs to solve the higher-order e-quations simultaneously,and the calculation efficiency is lower than that of interpolation method.The chord length of the interpolation method is an approximate value,and the calculation accuracy is lower than that of the geometric method,but the calculation efficiency is high.Both methods meet the calculation accuracy requirements and can realize the visual output of the calculation results.
分 类 号:U24[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.220.1.197