高速铁路长大隧道GSM-R网络冗余组网方案分析  被引量:8

Analysis of GSM-R Redundancy Networking Scheme for Long Tunnel of High Speed Railway

在线阅读下载全文

作  者:袁廷瑞 熊洁[1] 路晓彤 焦晓辉 Yuan Tingrui;Xiong Jie;Lu Xiaotong;Jiao Xiaohui(China Railway Eryuan Engineering Group Co.,Ltd.,Chengdu 610031,China;Engineering Management Center,China State Railway Group Co.,Ltd.,Beijing 100844,China)

机构地区:[1]中铁二院工程集团有限责任公司,成都610031 [2]中国国家铁路集团有限公司工管中心,北京100844

出  处:《铁路通信信号工程技术》2024年第1期36-41,共6页Railway Signalling & Communication Engineering

摘  要:高速铁路长大隧道需要按照GSM-R冗余组网方案进行覆盖。目前GSM-R网络可采用数字直放站与分布式基站作为数字中继设备,两种设备均有多种组网方案。从故障应对能力、载频利用率、建设成本等多个角度开展分析,对比多种高速铁路隧道内GSM-R数字中继设备冗余组网方案,提出各种方案的适用范围和性能优劣。Long tunnels of high-speed railway need to be covered according to GSM-R redundancy networking scheme.At present,GSM-R network can use two kinds of digital relay equipment:digital repeater and distributed base station.Both of the equipment have a variety of networking solutions.This paper analyzes the fault response capability,carrier frequency utilization,construction cost and other aspects,compares various GSM-R digital relay equipment redundancy networking schemes in high-speed railway tunnels,and proposes the application scope and performance advantages and disadvantages of various schemes.

关 键 词:GSM-R 组网 高速铁路 隧道 无线通信 

分 类 号:U285.21[交通运输工程—交通信息工程及控制]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象