检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:马志远 王勃 杨茂[1] 王钊 MA Zhiyuan;WANG Bo;YANG Mao;WANG Zhao(Key Laboratory of Modern Power System Simulation and Control&Renewable Energy Technology of Ministry of Education,Northeast Electric Power University,Jilin 132012,China;National Key Laboratory of Renewable Energy Grid-Integration,China Electric Power Research Institute,Beijing 100192,China)
机构地区:[1]现代电力系统仿真控制与绿色电能新技术教育部重点实验室(东北电力大学),吉林132012 [2]可再生能源并网全国重点实验室(中国电力科学研究院有限公司),北京100192
出 处:《高电压技术》2024年第9期3934-3943,共10页High Voltage Engineering
基 金:国家重点研发计划(大规模风电/光伏多时间尺度供电能力预测技术)(2022YFB2403000)。
摘 要:为了在数据量不足的情况下增强新投运风电场的功率预测能力,提出了一种基于二维风速修正和多重集成的两阶段迁移学习短期风电功率预测方法。首先,在数据增强阶段,引入投运前气象站的测风数据,基于风电场的时空相关性关系,通过时序特征构建和场景匹配,从时空2个维度对预报风速进行初步修正。然后,对初步修正后的结果进行数据重构,以重构后的数据作为下一次集成的输入,构建多重集成模型对预报风速进行二次修正。最后,在功率预测阶段,基于一阶段的修正结果,通过门控循环单元(gate recurrent unit,GRU)得到预测功率。算例结果表明,所提方法使预报风速的均方根误差降低了1.038m/s,功率预测精度提升了4.718%。论文研究可为新投运风电场的短期功率预测提供参考。In order to improve the power prediction accuracy of newly-invested grid-connected wind farms with insuffi-cient data,a method,which is named for two-stage transfer learning short-term wind power prediction,based on two-dimensional wind speed correction and multiple integration is proposed.Firstly,at data enhancement stage,the wind measurement from weather stations before connection to grid is used.The spatio-temporal correlation of wind farms is taken into consideration,and time series features are constructed and scenes are matched.The forecast wind speeds are preliminarily corrected in both temporal and spatial dimensions.Then,the preliminary corrected results are reconstructed as the input of the next integrated learning,and a multiple integrated learning model is constructed to correct forecast wind speed again.Finally,at power prediction stage,the forecast power is obtained by GRU based on the data correction.The results show that the proposed method can be adopted to reduce the root mean square error of the forecast wind speed by 1.038 m/s and improve the accuracy of power prediction by 4.718%.The research can provide a reference for new-ly-invested grid-connected wind farms power prediction.
关 键 词:功率预测 风速修正 集成学习 迁移学习 时空相关性 新投运风电场
分 类 号:TM614[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.170