检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:安云辉 An Yunhui
机构地区:[1]中铁十四局集团有限公司,山东济南250101
出 处:《江苏建材》2025年第2期95-96,共2页Jiangsu Building Materials
摘 要:在隧道工程施工过程中,软岩大变形问题会影响工程的施工质量及安全,考虑到工程的稳定性,需加强隧道软岩大变形施工控制方法研究,做好施工过程的技术控制以及现场管理,以提高工程的稳定性。基于此,下文对单线铁路隧道软岩大变形控制施工技术及相关内容展开分析及研究,以期为相关人士提供参考意见。In the stage of tunnel engineering construction process,the problem of large deformation of soft rock will affect the construction quality and safety of the project,considering the stability of the project,it is necessary to strengthen the research on the construction control method of large deformation of soft rock in the tunnel,and do a good job in the technical control and on-site management of the construction process,so as to improve the stability of the project.Based on this,the following analysis and research on the construction technology and related contents of soft rock large deformation control in single-track railway tunnels are carried out in order to provide reference opinions for relevant parties.
分 类 号:U45[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38