检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李雪婷[1] 魏德勇[2] 倪少权[1] 左大杰[1]
机构地区:[1]西南交通大学交通运输学院,四川成都610031 [2]铁道第二勘测设计院线路处,四川成都610031
出 处:《铁道运输与经济》2003年第7期48-49,共2页Railway Transport and Economy
摘 要:以达成线成都—遂宁单线半自动闭塞区段为例,通过计算机编图软件模拟分析,研究了在繁忙时段连续开行高等级旅客列车对全段通过能力和旅行速度的影响。总的研究结果表明高等级列车的连续开行对全线通过能力没有显著影响,同时对高等级列车连续开行采用不同时间间隔时,在列车速度、扣除系数等指标的影响方面也给出了一些具体结论。Taking Chengdu-Suining single line, the semi auto-block sectionof Da-Cheng line as example, with the aid of simulated analysis by computertrain-graph generation software, the paper studies the influences of continu-ally dispatching high-rank passenger trains during busy hours to the throughcapacity of whole section and to the travel speed. As an overall result, thecontinuous high-rank passenger trains will not have notable impact to thethrough capacity of whole line. In the meanwhile, it comes up with some de-tailed conclusions for the influences to train speed and coefficient of removalwhen continually dispatching high-rank passenger trains at different interval.
关 键 词:高等级客车 单线 半自动闭塞区段 连续开行 通过能力 铁路 旅行速度 扣除系数
分 类 号:U292.52[交通运输工程—交通运输规划与管理] U284.42[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117