相关期刊:《International Journal of Transportation Science and Technology》《Journal of Computer and Communications》《Computers, Materials & Continua》《Building Simulation》更多>>
supported by Changsha Municipal Natural Science Foundation(No.KQ2014146);National Natural Science Foundation of China(Grant No.52072264,71771150,72171175,71890970,72021002);National Key Research and Development Program of China(Grant No.2018YFB1600900).
Intercity high-speed rail (HSR) is a type of mass transit built in densely populatedmetropolitan areas and has become an essential part of sustainable transportation systemsin some countries. One of the most challengi...
This research work was supported by the University Malaysia Sabah,Malaysia.
University timetabling problems are a yearly challenging task and are faced repeatedly each semester.The problems are considered nonpolynomial time(NP)and combinatorial optimization problems(COP),which means that they...
supported by the National Natural Science Foundation of China (52008328);National Key Research and Development Project (2018YFD1100202);the Science and Technology Department of Shaanxi Province (2020SF-393,2018ZDCXL-SF-03-04);the State Key Laboratory of Green Building in Western China (LSZZ202009).
The energy consumption of a teaching building can be effectively reduced by timetable optimization.However,in most studies that explore methods to reduce building energy consumption by course timetable optimization,se...
supported by Deanship of Scientific Research at Imam Abdulrahman Bin Faisal University,under the Project Number 2019-383-ASCS.
Timetabling problem is among the most difficult operational tasks and is an important step in raising industrial productivity,capability,and capacity.Such tasks are usually tackled using metaheuristics techniques that...
A real-life problem is the rostering of nurses at hospitals.It is a famous nondeterministic,polynomial time(NP)-hard combinatorial optimization problem.Handling the real-world nurse rostering problem(NRP)constraints i...
This work was supported in part by the Outstanding Young Scholar Program of National Natural Science Foundation of China(NSFC)(Grant No.61522311);in part by the General Program of NSFC(Grant No.61773300);in part by the Key Program of Fundamental Research Project of Natural Science of Shaanxi Province,China(2017JZ017);in part by the Doctoral Students'Short-Term Study Abroad Scholarship Fund of Xidian University.
As the first attempt,this paper proposes a model for the Chinese high school timetabling problems(CHSTPs)under the new curriculum innovation which was launched in 2011 by the Chine6e government.Aooording 10 the new ou...
Urban Transit Scheduling Problem (UTSP) is concerned with determining reliable transit schedules for buses and drivers by considering the preferences of both passengers and operators based on the demand and the set of...
The existing Big Data of transport flows and railway operations can be mined through advanced statistical analysis and machine learning methods in order to describe and predict well the train speed, punctuality, track...
National Natural Science Foundations of China(Nos.61174040,61573144,11304200);Shanghai Commission of Science and Technology,China(No.12JC1403400);Shanghai Municipal Education Commission for Training Young Teachers,China(No.ZZSDJ15031);Shanghai Teaching and Reforming Experimental Undergraduate Majors Construction Program,China
Job shop scheduling has become the basis and core of advanced manufacturing technology. Various differences exist between academic research and practical production. The majority of previous researches on job shop sch...
This paper presents two optimization methods for solving the passenger train timetabling problem to minimize the total delay time in the single track railway networks. The goal of the train timetable problem is to det...