盾构工程渠箱下端头水平加固技术  被引量:1

Horizontal Grouting of End-wall Reinforcement for Shield Tunneling on the Base of the Channel Box

在线阅读下载全文

作  者:黄威然 竺维彬[2] 米晋生 

机构地区:[1]广州轨道交通建设监理有限公司,广州510010 [2]广州市地下铁道总公司,广州510030

出  处:《广东土木与建筑》2012年第4期50-52,共3页Guangdong Architecture Civil Engineering

摘  要:盾构工程在始发和到达施工中需要进行端头加固,如果市政渠箱妨碍了地面加固,则盾构工程可能面临涌水涌砂的风险。文中介绍了水平注浆工法,该工法有效加固端头土体,既保护了市政渠箱,也保证了盾构安全到达。From the shield tunneling launching shaft to the end of the construction,end-wall reinforcement should be done by the grouting technology.If this engineering reinforcement was once obstructed by the municipal channeling body,the risks of water and sand gushing to the tunnel construction would be faced to shield tunnel construction.The paper introduces the horizontal grouting processing techniques for effectively strengthening the soil mass for the end-wall reinforcement,which protects the municipal channeling body and ensures the shield tunneling construction safely at the launching and ending phase.

关 键 词:隧道 盾构 端头加固 水平注浆 

分 类 号:U45[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象