检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]重庆交通大学结构工程重点实验室,重庆400074 [2]同济大学地下建筑与工程系,上海200092
出 处:《公路交通技术》2014年第3期86-89,94,共5页Technology of Highway and Transport
基 金:重庆交通大学(桥梁)结构工程重点实验室开放基金项目(CQSLBF-Y11-3)
摘 要:通过考虑渗流影响的三维有限元数值模拟,对高水压条件下盾构隧道开挖面稳定性进行研究,获得开挖面破坏模式和极限支护压力。研究结果表明:开挖面前方土体破坏面倾角随水位增高而逐趋平缓,总极限支护压力与水位高度呈非线性关系,且其斜率随水位增高而增大;在水位高度一定时,隧道埋深越小,渗流力对开挖面破坏模式和极限支护压力的影响越大。In consideration of 3D finite element numerical simulation for seepage effects, this paper studies the stability of excavated surface of shielded tunnels under the condition of high water pressure to obtain failure modes of excavated surface and limit support pressure. The results of study show that the angle of inclination failure surface of soil mass in front of the excavated surface gradually is intended to flatten with increase of water level, overall limit support pressure has a non-linear relationship with height of water level, and its slope increases with water level ; at the fixed height of water level, the less the burial depth of tunnels, the more influences of seepage force on failure modes of the excavated surface and limit support.
分 类 号:U459.2[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15