检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王茂靖[1] 付开隆[1] WANG Maojing;FU Kailong(China Railway Eryuan Engineering Group Co.,Ltd.,Chengdu 610031,China)
机构地区:[1]中铁二院工程集团有限责任公司
出 处:《高速铁路技术》2019年第5期56-61,66,共7页High Speed Railway Technology
摘 要:西南山区某铁路双线特大桥开通运营以来,多个桥墩出现异常沉浮,对铁路运营产生了一定影响,铁路运输部门对通过此桥列车进行了限速。为查明桥墩异常升降的原因,文章以此桥为研究背景,结合地质补充勘察资料,分析了桥墩沉浮机理,提出了山区桥梁建设中需要重视的几个方面,对从事铁路勘察设计的工程技术人员具有很好的参考借鉴意义。Since the operation,many piers of a double-track super-large railway bridge in southwest mountainous area sink and float abnormally,which has a certain impact on railway operation.Railway transportation departments have limited the speed of trains passing through the bridge.In order to find out the reasons for the abnormal sinking and floating of piers,this paper takes this bridge as the research background,combines with geological supplementary survey data,analyzes the sinking and floating mechanism of piers,and puts forward several aspects that need to be paid attention to in the construction of bridges in mountainous areas,which has a good reference significance for engineers and technicians engaged in railway survey and design.
分 类 号:U443.22[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.28.190