检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈伟[1,2,3] 吕苗苗 辛宇超[1,2,3] CHEN Wei;LU Miaomiao;XIN Yuchao(School of Transportation and Logistics,Southwest Jiaotong University,Chengdu 610031,China;National and Local Joint Engineering Laboratory of Comprehensive Intelligent Transportation,Southwest JiaoTong University,Chengdu,610031,China;National Engineering Laboratory of Integrated Transportation Big Data Application Technology,Chengdu 610031,China)
机构地区:[1]西南交通大学交通运输与物流学院,四川成都610031 [2]综合交通运输智能化国家地方联合工程实验室,四川成都610031 [3]综合交通大数据应用技术国家工程实验室,四川成都610031
出 处:《综合运输》2020年第4期82-87,共6页China Transportation Review
基 金:国家重点研发计划资助(2016YFC0802208);国家自然基金项目(61703351);中国铁路总公司科技研究计划项目(P2018T001);四川省科技计划项目(2018RZ0078,2019JDR0211);成都市软科学研究项目(2017-RK00-00028-ZF,2017-RK00-00378-ZF);中央高校基本科研业务费专项资金资助(2682017CX022,2682017CX018)。
摘 要:针对200km/h客货共线运输组织模式,本文分别研究了在不考虑到发线数量限制、考虑到发线数量限制以及天窗布设情况下200km/h客货共线铁路通过能力分时段计算方法。研究表明,不考虑到发线数量限制条件,低等级列车可以采用有越行、多列追踪的方式通过区段,线路通过能力较大;考虑到发线数量限制条件,低等级列车可以采取有越行追踪的方式通过区段,追踪列车的数量与车站到发线数量有关,到发线数量对线路通过能力有较大影响;考虑天窗布设情况下,由于全线综合维修天窗不连续,全程列车不仅受本段综合维修天窗的影响,而且受相邻区段的天窗影响。As for 200 km/h mixed passenger and freight railway,the calculation method of carrying capacity in different time of a day is studied under different conditions including no limit of the number of arrivaldeparture lines,and the limit of the number of arrival-departure lines and the arrangement of maintenance time.The research shows that,without considering the limit of of arrival-departure lines,low-level trains can adopt multiline and multi-train tracking to pass through the section,which would increase the line carrying capacity.Considering the limit of arrival-departure lines,low-level trains can adopt multiline tracking to pass through the section.In this case,the number of tracking trains is related to arrival-departure lines in the station,and the arrival-departure lines have great influence on the carrying capacity.What’s more,as the maintenance time are not continuous,the whole train is affected by the maintenance times of this section and adjacent sections.
分 类 号:U292.5[交通运输工程—交通运输规划与管理]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.219.89.207