检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:唐汐[1,2] TANG Xi(Beijing Rail Transit Construction Management Co.,Ltd.,Beijing 100068,China;Beijing Key Laboratory of Fully Automatic Operation and Safety Monitoring for Urban Rail Transit,Beijing 100068,China)
机构地区:[1]北京市轨道交通建设管理有限公司,北京100068 [2]城市轨道交通全自动运行系统与安全监控北京市重点实验室,北京100068
出 处:《铁道标准设计》2023年第5期80-87,共8页Railway Standard Design
基 金:国家自然科学基金项目(41807262)。
摘 要:为得到基坑开挖对邻近下卧既有隧道变形受力影响,提出一种可预测基坑开挖对下卧隧道竖向变形影响的简化计算方法。采用Mindlin解获得基坑开挖引起既有隧道轴线处的附加应力,将隧道假定成无限长Euler-Bernoulli梁搁置在Vlasov地基;引入隧道侧向土体的影响,考虑既有隧道两端约束,进一步得到隧道竖向变形差分解。工程案例研究表明:与既有文献中有限元数据和实测数据对比,验证了该方法计算结果的合理性;与将隧道搁置在Vlasov地基模型(EB-V模型)和Winkler(EB-W模型)地基模型的解析计算结果比较,本文方法计算结果更贴近实测数据。进一步参数研究表明:隧道与基坑中心间距、隧道埋深以及土体模量的增大会引起隧道竖向变形及内力减小;随着既有隧道抗弯刚度逐渐增大,隧道竖向变形会逐渐减小,但会引起既有隧道内力增大。To obtain the deformation and stress of existing tunnel due to adjacent foundation pit excavation above,a simplified method for predicting the influence of the excavation on the existing tunnel is presented.Additional stress at axis of existing tunnel caused by excavation can be calculated by Mindlin solution.The tunnel is assumed as Euler-Bernoulli beam laying on the Vlasov foundation and the influence of the lateral soil of the tunnel is introduced.Considering the constraints at the two ends of tunnel,difference decomposition of vertical deformation of existing tunnel can be obtained.The engineering case study shows that compared with the finite element method and the measurement in the existing literature,the feasibility of the calculation results of the presented method is confirmed.Compared with the analytical calculation results of the tunnel resisting on the Vlasov foundation model(EB-V model)and the Winkler foundation model(EB-W model),the presented method is in line with measurement.Further investigation indicates that the increment of the distance between tunnel and excavation center,the tunnel buried depth and the soil modulus will result in the reduction of the vertical deformation and internal force of the tunnel.With the increasing of tunnel bending stiffness,tunnel vertical deformation will decrease gradually,but the tunnel internal force will increase.
关 键 词:基坑开挖卸载 隧道变形 EULER-BERNOULLI梁 Vlasov地基 侧向土体作用 简化算法
分 类 号:TU753[建筑科学—建筑技术科学] U45[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.170