supported by the Innovative Research Groups of National Natural Science Foundation of China(No. 51621092);National Basic Research Program of China ("973" Program, No. 2013CB035904);National Natural Science Foundation of China (No. 51439005)
During the storehouse surface rolling construction of a core rockfilldam, the spreading thickness of dam face is an important factor that affects the construction quality of the dam storehouse' rolling surface and the...
Project(51321065)supported by the Innovative Research Groups of the National Natural Science Foundation of China;Project(2013CB035904)supported by the National Basic Research Program of China(973 Program);Project(51439005)supported by the National Natural Science Foundation of China
Accurate 3-D fracture network model for rock mass in dam foundation is of vital importance for stability,grouting and seepage analysis of dam foundation.With the aim of reducing deviation between fracture network mode...
supported by the National Basic Research Program of China (973 Program, No. 2013CB035904);the Innovative Research Groups of the National Natural Science Foundation of China (No. 51321065);the National Natural Science Foundation of China (No. 51439005)
Effectively and accurately modelling the spatial relation of fracture surfaces is crucial in the design and construction of large hydropower dams having a complex underlying geology. However, fracture surfaces are ran...
supported by the Foundation for Innovative Research Groups of National Natural Science Foundation of China(No.51321065);the Foundation for Key Program of Natural Science Foundation of High Arch Dam(No.51339003);the National Basic Research Program of China(‘‘973’’Program,No.2013CB035904)
Sequence placement logic plays a significant role in construction simulation of high arch dams and directly affects the simulation process and results. To establish a sequence logic for dam block placement, the constr...