Funded by the Program for Innovative Research Team in University (IRT1050);the Ministry of Transport Technology Project(201131982020);the Key Program of Shaanxi Natural Science Foundation for Basic Research Plan (2010JZ009)
Small stone asphalt mixture(SSAM) was designed by Bailey method and coarse aggregate voids-filling method.The optimum asphalt content was determined by Marshal test.Surface texture depth for SSAM with different void...
Program for Changjiang Scholars and Innovative Research Team in University(IRT1050);Technology Project of Ministry of Transport(2011-319-812-020);Key Program of Shaanxi Natural Science Foundation for Basic Research Plan(2010JZ009);Special Fund for Basic Scientific Research of Central Colleges(CHD2012ZD002,CHD2010ZY013)
Special Fundfor Basic Scientific Research of Central Colleges(CHD2010JC002);Technology Project of Ministry of Transport(2011-319-812-020);Key Programof Shaanxi Natural Science Foundationfor Basic Research Plan(2010JZ009)