Taizhou Yangtze River Bridge——The first kilometer level three-pylon two-span suspension bridge in the world
《Engineering Sciences》2011年第2期2-8,共7页Zhong Jianchi 
National Science and Technology Support Program of China ( No. 2009BAG15B01);Key Programs for Science and Technology Development of Chinese Transportation Industry( No. 2008-353-332-190)
Taizhou Bridge, located at the middle of Jiangsu Province, connecting Taizhou City and Zhenjiang City, started in Dec. 2007. The bridge is the first kilometer level three-pylon suspension bridge in the world, and it a...
关键词:three-pylon suspension bridge innovation design caisson in water herringbone steel tower 
Technical research on control of caisson construction for the middle tower foundation of Taizhou Bridge
《Engineering Sciences》2011年第2期9-13,45,共6页Liu Jianbo Yang Yanhua Zhang Yongtao Du Song 
National Science and Technology Support Program of China ( No. 2009BAG15B02);Key Programs for Science and Technology Development of Chinese Transportation Industry( No. 2008-353-332-150)
The real-time informational monitoring system is adopted in the construction of middle tower foundation of Taizhou Bridge for the first time. The geometric state of the caisson, the stress of upstream and downstream a...
关键词:Taizhou Bridge caisson foundation control technology real-time monitoring system 
Vibration mechanism research of large-scale and deep-water caisson
《Engineering Sciences》2011年第2期14-19,共6页Yin Haihua Han Jingjing 
National Science and Technology Support Program of China ( No. 2009BAG15B02) ;Key Programs for Science and Technology Development of Chinese Transportation Industry( No. 2008-353-332-150)
According to the construction method of Taizhou Bridge, numerical simulation is conducted to analyze the vibration of caisson under wind and water flows to determine the main factors of the caisson vibration. Meanwhil...
关键词:Taizhou Bridge caisson foundation sensitivity analysis vibration mechanism vibration control methods 
On-site tests to estimate aquifer permeability of drainage area of south caisson anchorage construction of Taizhou Bridge
《Engineering Sciences》2011年第2期20-25,共6页Feng Zhaoxiang Zhao Yanrong 
Special Fund of"333"High Level Talent Training Project of Jiangsu Province;National Scienceand Technology Support Program of China ( No. 2009BAG15B02) ;Key Programs for Science and Technology De-velopment of Chinese Transportation Industry( No. 2008-353-332-150)
During the construction of the south caisson anchorage of Taizhou Bridge, the drainage area is located in the lower reaches of the Yangtze River and the permeability of stratums there is considerable. In order to main...
关键词:Taizhou Bridge south-anchor caisson pumping test slug test 
A Study of the system control model of caisson dewatering of the north anchorage of Taizhou Bridge
《Engineering Sciences》2011年第2期26-32,共7页Zhao Yanrong Zhou Zhifang Ruan Jing 
National Science and Technology Support Program of China ( No. 2009BAG15B02) ;Key Pro-grams for Science and Technology Development of Chinese Transportation industry ( No. 2008-353-332-160) ;Jiangsu Province College Graduate Research and Innovation Program ( No. CX08B_123Z) ;2009 Natural ScienceFoundation of Hohai University ( No. 2009424011);the Fundamental Research Funds for the Central Universi-ties ( No. 2009B11814)
A caisson foundation is applied to the north anchorage of Taizhou Yangtze River Highway Bridge of which the initial caisson sinking requires dewatering. Since the caisson foundation is quite close to nearby buildings,...
关键词:Taizhou Bridge caisson of north anchorage construction dewatering system control model 