supported by the National Natural Science Foundation of China(Nos.12271295 and 12001313);the Provincial Natural Science Foundation of Shandong(No.ZR2022MA019).
In this paper,we consider the single-machine scheduling with step-deteriorating jobs and rejection.Each job is either rejected by paying a rejection penalty,or accepted and processed on the single machine,and the actu...
supported by the National Nature Science Foundation of China under Grant Nos.11426094,11271338 and U1504103
This paper considers the scheduling problem with rejection on m identical parallel machines to minimize the maximum flow time. The authors show that this problem is NP-hard even when there is a single machine and all ...
the National Natural Science Foundation of China(Nos.11271338 and 71301038);the National Natural Science Foundation of Henan Province(No.15IRTSTHN006).
We study the computational complexities of three problems on multi-agent scheduling on a single machine.Among the three problems,the computational complexities of the first two problems were still open and the last pr...
In this paper, a computational effective heuristic method for solving the minimum makespan problem of job shop scheduling is presented. It is based on taboo search procedure and on the shifting bottleneck procedure us...
P k |fix| C max problem is a new scheduling problem based on the multiprocessor parallel job, and it is proved to be NP hard problem when k ≥3. This paper focuses on the case of k =3. Some new observations and new te...