Since the first beam was got in 2014,the100 MeV compact cyclotron(CYCIAE-100)has been into the operation process.75-100 MeV proton beams were extracted by the stripping extraction mode.The extracted proton energy for ...
One of the important parameters of the CYCIAE-100cyclotron is that the proton beam energy reaches more than 100 MeV.In order to measure the beam energy,proton beam is calibrated by a three-dimensional water tank syste...
The 100 MeV compact cyclotron(CYCIAE-100)has been into the operation process.75-100 MeV proton beams with the beam current of200μA are extracted by the stripping extraction mode.Two sets of stripping extraction syste...
A 100 MeV H-compact cyclotron(CYCIAE-100)has started operation from 2016at China Institute of Atomic Energy(CIAE).The continuous proton beams of 75-100MeV with the beam current of 200μA have been extracted in dual op...
The CYCIAE-100 cyclotron Beamdump beam line will realize the acceptance and debugging of the beam strength of 200μA at the end of2017,and the beam collector will be stabilized at the Beamdump beam collector to the be...