Shanghai Science & Technology Development Foundation (022512065) and Shanghai Construction Technology Development Foundation (A0206101).
In the seismic safety evaluation (SSE) for key projects, the probability-consistent spectrum (PCS), usually obtained from probabilistic seismic hazard analysis (PSHA), is not consistent with the design response spectr...