检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]华南理工大学土木与交通学院,广州510640
出 处:《交通信息与安全》2011年第1期12-15,共4页Journal of Transport Information and Safety
摘 要:当BRT车站濒临交叉口时,上游交叉口的信号控制易影响下游车站的进站排队,进而影响车辆在车站的延误;以车辆在交叉口的延误和在车站的延误总和最小为目标,采用动力学、信号控制和交通流等方法建立交叉口的信号配时优化算法,并用Visual Basic实现算法。以广州市中山大道BRT的车陂交叉口与车陂站为案例,用Vissim仿真验证算法。仿真结果表明算法的正确性与实用性,实现了车辆的总延误最小。For BRT stations in the vicinity of intersection,the signal control of the upstream intersection affects the queue and delay of the downstream station.By minimizing the total delay of vehicles at the station and in the intersection,an intersection signal timing optimization algorithm is established with dynamic control of traffic flow and implemented by using Visual Basic.Finally,taking Chebei Intersection and Chebei Station of the BRT of Zhongshan Road in Guangzhou as an example,the paper verifies the algorithm by VISSIM simulation.The simulation results show that the algorithm is effective and practical to achieve the minimum total delay of the vehicles.
关 键 词:交通工程 信号配时优化 动力学 BRT车站 交叉口
分 类 号:U491[交通运输工程—交通运输规划与管理]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15