基于安全区段的站后双折返线折返能力分析  被引量:7

Capacity Analysis of Station-behind Double Turn-back Line with Overlap

在线阅读下载全文

作  者:陈垚[1] 毛保华[1,2] 李明高[1] 赵欣苗[1] 赵宇刚[3] 

机构地区:[1]北京交通大学城市复杂系统理论与技术教育部重点实验室,北京100044 [2]中国综合交通研究中心,北京100044 [3]铁道部经济规划研究院,北京100038

出  处:《都市快轨交通》2014年第5期55-59,共5页Urban Rapid Rail Transit

基  金:国家自然科学基金重点项目(71131001);国家重点基础研究发展计划项目(2012CB725406)

摘  要:针对站后双折返线,考虑接车进路的安全区段,分别对安全区段延伸到正线和道岔两种情况的折返过程进行分析,并建立折返出发间隔的解析计算公式。以天津江湾二支路站与DKZ4型列车作为算例,计算、分析不同情况下的车站折返能力。研究结果表明:在江湾二支路站,安全区段需要延伸到道岔,靠近出发正线的折返线能力比靠近进站正线的折返线大7列/h;在增设绝缘节后,使安全区段延伸到正线,两折返线能力分别增加2.48列/h和9.5列/h。This paper took an account of overlap of arriving routes, analyzed the turn-back process of station-behind double turn-back line and the calculation formula of turnback departure interval was established. Taking Jiangwanerzhilu Station and DKZ4 trains as an example, accurate results of the turn-back capability calculated by train traction calculation were obtained. The results show that in Jiangwanerzhilu Station, the overlap need reach crossing and the capability of turn-back line which is close to departure main line is 7 more than the other line. Through setting insulation section, the overlap does not need reach crossing, then the capability of two turn-back lines increase by 2.45 and 9.5 respectively.

关 键 词:城市轨道交通 折返能力 双折返线 安全区段 

分 类 号:U231.92[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象