This project is supported by National Natural Science Foundation of China (No.59889505, No.70071017).
A two-phase approach is proposed to deal with the integration problem in theloop layout. Tabu search is applied to cell construction in phase 1 to minimize the inter-cell flow,and the heuristic for layout design is us...