Supported by the National Natural Science Foundation of China(No.61273035,71471135)
To adapt to the complex and changeable market environment,the cell formation problems(CFPs) and the cell layout problems(CLPs) with fuzzy demands were optimized simultaneously. Firstly,CFPs and CLPs were described for...
National Natural Science Foundations of China(Nos.71471135,61273035)
A modified shifting bottleneck algorithm was proposed to solve scheduling problems of a large-scale job shop.Firstly,a new structured algorithm was employed for sub-problems so as to reduce the computational burden an...
Supported by the National Natural Science Foundation of China(No.61273035,71471135)
Buffer influences the performance of production lines greatly.To solve the buffer allocation problem(BAP) in serial production lines with unreliable machines effectively,an optimization method is proposed based on an ...
Supported by the National High Technology Research and Development Programme of China(No.2009AA043000);the National Natural Science Foundation of China(No.61273035,71471135)
In order to improve the scheduling efficiency of photolithography,bottleneck process of wafer fabrications in the semiconductor industry,an effective estimation of distribution algorithm is proposed for scheduling pro...
The National Natural Science Foundation of China(No.61273035,71471135)
In order to improve the efficiency of operating rooms,reduce the costs for hospitals and improve the level of service qualities, a scheduling method was developed based on an estimation of distribution algorithm( EDA...