This article considers the two-level supply chain model incorporating an imperfect production process under a variable lead time.The cost of producing a unit item is calculated as a function of the production rate.In ...
financial support of the Australian Research Council (DP210101281)。
There has been a wealth of research that has examined the nature of rework in construction.Progress toward addressing the rework problem has been limited-it still plagues practice,adversely impacting a project’s perf...
This paper develops an integrated fuzzy two-layer supply chain for manufacturersand retailers with defective and non-defective types of products. The manufacturerproduces up to a specific time, including both faulty a...
This work was supported by University Grants Commission–Special Assistance Program(DSA I)[grant number F.510/7/DSA-I/2015(SAP-I)],Government of India,New Delhi.
In this paper,three production inventory models are constructed for an imperfect manufacturing system by considering a warm-up production run,shortages during the hybrid maintenance period,and the rework of imperfect ...
In intercontinental trade and economics goods are bought from a global supplier.On occasion,the expected lot may include a fraction of defective items.These imperfect items still have worth and can be sold to customer...
supported by the National Natural Science Foundation of China (Nos. 71471087, 71071076, 61673209);the Funding for Outstanding Doctoral Dissertation in Nanjing University of Aeronautics and Astronautics (No. BCXJ17-11);the Research and Innovation Program for Graduate Education of Jiangsu Province (No. KYZZ160145)
To reduce the uncertainty and reworks in complex projects,a novel mechanism is systematically developed in this paper based on two classical design structure matrix(DSM)clustering methods:Loop searching method(LSM)and...
sponsored by the National Natural Science Foundation of China(Nos.51134025 and 51274204);the New Century Excellent Talents in University(No.NCET-12-0965)
Aiming at soft rock ground support issues under conditions of high stress and long-term water immersion, the ground failure mechanism is revealed by taking the deep-water sumps of Jiulong Mine as the engineering backg...