SCHEDULE

作品数:327被引量:308H指数:7
导出分析报告
相关领域:自动化与计算机技术更多>>
相关作者:汤卫平宋宝燕于戈郭迪王玺更多>>
相关机构:清华大学北京航空航天大学南京航空航天大学国防科学技术大学更多>>
相关期刊:更多>>
相关基金:国家自然科学基金国家重点基础研究发展计划中国博士后科学基金北京市自然科学基金更多>>
-

检索结果分析

结果分析中...
选择条件:
  • 主题=COSTx
条 记 录,以下是1-4
视图:
排序:
Generation and Analysis of Hybrid-Electric Vehicle Transmission Shift Schedules with a Torque Split Algorithm被引量:1
《Journal of Transportation Technologies》2020年第1期21-49,共29页Nicholas J. Connelly Derek I. George Andrew C. Nix W. Scott Wayne 
The increased concern over global climate change and lack of long-term sustainability of fossil fuels in the projected future has prompted further research into advanced alternative fuel vehicles to reduce vehicle emi...
关键词:Hybrid-Electric Vehicles TORQUE SPLIT ALGORITHM SHIFT SCHEDULE SHIFT Map COST Function SOC Dependent 
A review of metro construction in China: Organization,market, cost, safety and schedule被引量:10
《Frontiers of Engineering Management》2017年第1期4-19,共16页Lieyun DING Jie XU 
supported by the National Natural Science Foundation General Program (Grant No. 51678265)
China is now in an era of large-scale metro construction. This paper reviews the nature of Chinese metro engineering with a specific focus on its organization and market mode, cost structure, safety control and schedu...
关键词:metro engineering construction status construction challenges NSFC 
Project Management
《Control and Systems Engineering》2017年第1期22-29,共8页Wanqing Song Chenyang Zhang Siyao Qin 
Construction project management is a complicated process.The essential factors for the survival and development of construction enterprises includes focus on construction project management,improve project quality,ens...
关键词:PROJECT MANAGEMENT COST MANAGEMENT SCHEDULE MANAGEMENT QUALITY MANAGEMENT 
Estimation Method of Schedule-cost Correlation Coefficient of Spaceflight Project
《工程科学(英文版)》2007年第3期69-75,共7页Liu Yanqiong(Humanity and Social Science School,National University of Defence Technology,Changsha,410073,China) 
To evaluate the cost risk and the schedule risk of the spaceflight project,the schedule-cost(S-C) correlation coefficient is directly appointed according to the experts' experience usually.This paper deduces SDMCU(the...
关键词:SPACEFLIGHT project risk COST SCHEDULE CORRELATION COEFFICIENT 
检索报告 对象比较 聚类工具 使用帮助 返回顶部