As the injector of the HIAF facility,the Ion Source Front-End system needs to provide intense highly charged heavy ions with mass-charge ratio M/Q=27 and energy E=14 keV/u.Meanwhile,the provided heavy ions are require...
A compact electromagnetic isotope separator(EMIS)for high purity isotope production has been developed,constructed and tested at IMP.The main part of the EMIS is a 180°separation magnet with a bending radius of 1000 ...
A superconducting linac prototype had been built for China Accelerator Driven Sub-Critical system(C-ADS)in 2017 at IMP.Fig.1 is the on-site picture of the Linac prototype with the ancillary instruments and beam line.I...
Since the beginning of 2018,320 kV HV platform for multi-discipline research with highly charged ions has been operated for about 6950 h,including 4650 h for experimental target time for universities,institutes and ot...
LEAF or the Low Energy heavy ion Accelerator Facility is a multidiscipline heavy ion research platform under construction at IMP.It is a 5 year National Major Instruments Research Program supported by National Science...
HIRFL accelerator facility has been operated with two ion sources as its pre-injectors,which are LECR3 and SECRAL-II.In 2018,there were 19 kinds of ion beams delivered successfully,and the service time of the two sour...
LEAF or the Low Energy heavy ion Accelerator Facility is a multidiscipline heavy ion research platform constructing at IMP.It is a 5-year National Major Instruments Research Program supported by National Science Found...