SCHEDULE

作品数:329被引量:308H指数:7
导出分析报告
相关领域:自动化与计算机技术更多>>
相关作者:汤卫平宋宝燕于戈郭迪王玺更多>>
相关机构:清华大学北京航空航天大学南京航空航天大学国防科学技术大学更多>>
相关期刊:更多>>
相关基金:国家自然科学基金国家重点基础研究发展计划中国博士后科学基金北京市自然科学基金更多>>
-

检索结果分析

结果分析中...
选择条件:
  • 基金=国家重点基础研究发展计划x
条 记 录,以下是1-7
视图:
排序:
Effect of Temperature Schedule on the Morphology of SiC Made From Graphite and Silicon Powder
《China's Refractories》2016年第4期23-28,共6页CHEN Junfeng LI Nan YAN Wen WEI Yaowu HAN Bingqiang 
supported by the 973 Program Earlier Research Project,under Grant No.2014CB660802
SiC whiskers were synthesized in a coke bed using a two-step heat treatment process.The temperature was held for 3 h at 1 200 ℃ before heating to 1 430 ℃ and holding for 3 h.The morphologies of SiC synthesized by th...
关键词:heating sintering graphite crystalline refractory ceramic grains holding explained nanotubes 
Schedule refinement for homogeneous multi-core processors in the presence of manufacturing-caused heterogeneity
《Frontiers of Information Technology & Electronic Engineering》2015年第12期1018-1033,共16页Zhi-xiang CHEN Zhao-lin LI Shan CAO Fang WANG Jie ZHOU 
Project supported by the National Natural Science Foundation of China(Nos.61225008;61373074;and 61373090);the National Basic Research Program(973)of China(No.2014CB349304);the Specialized Research Fund for the Doctoral Program of Higher Education,the Ministry of Education of China(No.20120002110033);the Tsinghua University Initiative Scientific Research Program
Multi-core homogeneous processors have been widely used to deal with computation-intensive embedded applications. However, with the continuous down scaling of CMOS technology, within-die variations in the manufacturin...
关键词:Schedule refining Multi-core processor HETEROGENEITY Representative chip operating point 
Initial experience of heroin use under a two-chained operant schedule influences drug-seeking behavior after one month of abstinence被引量:1
《Acta Pharmacologica Sinica》2010年第4期387-392,共6页Bin LU Mu LI Yuan-yuan HOU Jie CHEN Zhi-qiang CHI Jing-gen LIU 
AcknowledgementsThis study was supported by the National Basic Research Program grants from the Ministry of Science and Technology of China (No 2003CB515400 and No 2009CB522000), the National Science Fund for Distinguished Young Scholars from the National Natural Science Foundation of China (No 30425002) and the Chinese Academy of Sciences (No KSCXI/YW/R/68). We thank Aaron Ettenberg for helpful suggestions on runway behavior and Barry J Everitt for the heterogeneous chained schedule.
Aim: To evaluate the influence of an initial heroin experience under a modified two-chained training schedule on drug-seeking behavior after a long abstinence period. Methods: Rats were trained to respond for intr...
关键词:heroin initial experience two-chained schedule ABSTINENCE reinstatement 
Wavelength pre-assignment collision schedule for wavelength-routed optical networks被引量:1
《Chinese Optics Letters》2009年第11期978-982,共5页华一强 陆月明 赵同 纪越峰 饶宝全 
supported in part by the National"863" Program of China (No.2007AA01Z252);the National "973" Program of China (No.2007CB310705);the National Natural Science Foundation of China (No.60711140087);the Program for New Century Excellent Talents in University (No.06-0090);the Program for Changjiang Scholars and Innovative Research Team in University (No.IRT0609);the International S & T Cooperation Program of China (No.2006DFA11040)
A novel wavelength assignment scheme called the wavelength pre-assignment collision schedule (WPCS) is proposed for wavelength-routed networks. The WPCS pre-assigns the wavelength at the forward detection phase, and...
关键词:Blocking probability Fiber optic networks Telecommunication networks 
Construction Simulation and Real-Time Control for High Arch Dam被引量:6
《Transactions of Tianjin University》2008年第4期248-253,共6页钟登华 任炳昱 吴康新 
National Natural Science Foundation of China(No.50539120);National Basic Research Program of China("973"Program,No. 2007 CB714101);National Science Fund for Distinguished Young Scholars of China(No.50525927);National Natural Science Founda-tion of China(No.50579045)
A method of combining dynamic simulation with real-time control was proposed to fit the randomness and uncertainty in the high arch dam construction process. The mathematical logic model of high arch dam construction ...
关键词:high arch dam construction dynamic simulation schedule forecasting real-time control 
The Logic Description of the System of Embedded Hardware Logic Task
《Wuhan University Journal of Natural Sciences》2006年第3期567-571,共5页FENG Dan ZHU Yong ZHANG Jiangling 
Supported bythe National Basic Research Programof China (973 Program2004CB318201) ;the National Natural Sci-ence Foundation of China (60273074)
A new task mode, hardware logic task mode, is presented. Its architecture, schedule and implementation are described with HDI.( Hardware Description Language ), and the validity of the system has been proved by logi...
关键词:TASK hardware description language embedded system SCHEDULE 
Numerical Simulation of Asynchronous Simulated Moving Bed Chromatography被引量:4
《Chinese Journal of Chemical Engineering》2004年第3期415-420,共6页LU Jiangang 
Supported by the National Natural Science Foundation of China (No. 20206027), the Natural Science Foundation of Zhejiang Province (No. 202046);the National 973 Program of China (No. 2002CB312200).
Asynchronous simulated moving bed chromatography (ASMBC), known also as the 'VARICOL' process, is more efficient and flexible than the well-known and traditional simulated moving bed chromatography (SMBC). A detailed ...
关键词:simulated moving bed chromatography chiral separation numerical simulation Varicol process port switching schedule 
检索报告 对象比较 聚类工具 使用帮助 返回顶部