supported by the National Natural Science Foundation of China(Nos.62366003 and 62066019);the Natural Science Foundation of Jiangxi Province(No.20232BAB202046);the Graduate Innovation Foundation of Jiangxi University of Science and Technology(No.XY2022-S040).
With the advancement of the manufacturing industry,the investigation of the shop floor scheduling problem has gained increasing importance.The Job shop Scheduling Problem(JSP),as a fundamental scheduling problem,holds...